| Sign In | Join Free | My wpc-board.com |
|
MOQ : 1000m
Price : To be negotiated
Insulation : EVI-2
Packaging Details : Packed in rolls or reels
Packing : Packed In Reels
Temperature : -40-90℃
Certification : RoHS
Supply Ability : 100km per day
SP : 2500226
Payment Terms : T/T,L/C,Western Union
Brand Name : Shineplus
Voltage : 450/750V AC
Name : EV Charging Cable
Conductor : Bare Copper Stranded
Delivery Time : 3-4 Weeks
Place of Origin : China
Jacket : EVM-1
Model Number : Customize
Application : EV Charging Cable
Custom Bare Copper Stranded EV Charging Cable with EVI-2 Insulation and EVM-1 Jacket for Electric Vehicles
| Construction | ||||
| A:5C×4mm2 | B:1C×0.5mm2 | |||
| Conductor | Bare copper stranded | |||
| Cross section | 4mm2 | 0.50mm2 | ||
| Construction | 210/0.15mm+Tinsel+ Kevlar | 28/0.15mm+Tinsel+ Kevlar | ||
| Strand Dia.(Ref.) | 2.70mm | 1.15mm | ||
| Insulation | EVI-2 | |||
| Nom.Thickness | 0.70mm | 0.40mm | ||
| Min.Thickness | 0.53mm | 0.30mm | ||
| Insulation Dia. | 4.30±0.25mm | 2.00±0.10mm | ||
| Insulation colour | A1.brown A2.blue A3.black A4.gray A5.yellow/green | B1.black | ||
| Filler | PP rope | |||
| Tape | Non woven | |||
| Assembly | 5C×4mm2+1C×0.5mm2+W | |||
| Jacket | EVM-1 | |||
| Nom.Thickness | 1.30mm | |||
| Min.Thickness | 1.04mm | |||
| Outer Dia. | 15.40±0.50mm | |||
| Colour | per request | |||
Product Description
Application:EV Charging
Product character:
Tensile strength:≥20MPa Elongation:≥300%
Aged condition:110±1℃×168h
Percent of original tensile strength:±30%
Percent of original elongation: ±30%
Insulation:EVI-2
Conductor : Bare copper stranded
Construction
Insulation: A1.brown A2.blue A3.black A4.gray A5.yellow/green B1.black
Jacket Color : per request
Technical data
Rated voltage:450/750V AC
Rated Temperature: -40-90℃
Max.conductor DC resistance(20℃):A:4.95Ω/km B:39Ω/km
Dielectric Strength AC:2.5kV/5min
Properties
Effectively resist electromaganetic interference
Excellent insulation performance
Extensively Flame resistant
Flexible

|
|
Custom Bare Copper Stranded EV Charging Cable With EVI-2 Insulation / EVM-1 Jacket Images |